AEMS 2026 — Anaheim Electronics & Manufacturing Show

Meet us at the Anaheim Electronics & Manufacturing Show — Booth #216

Energy

Wire harnesses engineered for the field, from solar farm to battery rack.

Renewable energy and grid-scale electrical assemblies built to survive weather, sun, and vibration. High-current builds, UV-stable jackets, and IP-rated overmolds — we manufacture everything in the USA.

Energy sector wire harness assembly with high-current terminals and UV-stable jacketing

Capabilities & standards

  • Solar combiner and inverter harnesses
  • Wind turbine pitch, yaw, and control wiring
  • Battery pack / BESS interconnects
  • High-voltage orange harnesses for EV storage
  • UV-stable, IP-rated overmolds
  • 100% USA manufacturing
ISO 9001:2015IPC/WHMA-A-620Made in USA
Request a quote

FAQ

Common questions

Do you build harnesses for solar and wind?

Yes. We build solar combiner harnesses, wind turbine pitch and yaw wiring, and battery-pack interconnects with UV-resistant jackets and high-current terminals.

Can you handle high-current builds?

We work with conductors from 30 AWG signal wire up to heavy-gauge power cabling with proper crimp validation and pull testing.

Do you support battery / BESS applications?

Battery-management interconnects, high-voltage orange harnesses, and BMS communication cabling — spec them and we'll build them.

What environmental protection do you offer?

UV-stable jackets, IP-rated overmolds, heat-shrink boots, and potted connector transitions for outdoor and harsh-environment installations.

What are typical lead times?

Energy prototypes 1–3 weeks, production 4–8 weeks depending on connector and cable lead times.

Still have a question? Tap the chat button for a quick answer anytime, or send us your drawings.

Ready to spec your build?

Send drawings or a BOM 24/7 — our USA-based Sales team responds during business hours.